top of page
Οι εργασίες που απαιτήθηκαν ήταν:
· Demolitions, creating a unified kitchen-living room.
· Complete Hydraulic and Electrical installation
· Independent heating installation with existing gas boiler and radiators
· Floor tiles in imitation of wood
· Stone wall lining
· Stair covering with wood
· Master bathroom, WC
· Kitchen
· Closets
· Interior doors
· External frames
· Security door
· Gypsum False ceilings
· Internal – external painting
Ανακαίνιση διαμερίσματος Α΄ ορόφου στον Βύρωνα (2019)
ΠΡΙΝ
AFTER
Interested in renovating?
Fill out the form below and a specialist renovation consultant will contact you immediately.
bottom of page